600-Acre, 92 MW Photovoltaic (P.V.) Solar Project
Los Angeles County, CA
Key Project Staff
Joseph S.C. Bonadiman, P.E. – Project Engineer
Edward J. Bonadiman, P.L.S. – Survey Manager
Dennis W. Jackson, P.E. – Senior Water Resources Engineer
Project Description
JBA provided Civil Engineering consultation/design, site layout, grading plans, aerial survey control, field topographic surveying, ALTA, Record of Survey, Preliminary Hydrology Study & Drainage Analysis, Floodplain Simulation/Modeling & Analysis, quantities/cost estimates, public notice package, and Geotechnical bid management services for the 600-acre, 92 MW Alpine photovoltaic (PV) facility in Los Angeles County, CA.
The project was approved and conditioned by the Los Angeles County Planning Commission in December of 2010, and construction finished in 2012.
Client
Los Angeles County Planning Commission
Project Location
Los Angeles County, CA