300-Acre, 20 MW Photovoltaic (P.V.) Solar Project
San Diego County, CA
Key Project Staff
Joseph S.C. Bonadiman, P.E. – Project Engineer
Edward J. Bonadiman, P.L.S. – Survey Manager
Dennis W. Jackson, P.E. – Senior Water Resources Engineer
Project Description
JBA provided Civil Engineering consultation/design, site layout, grading plans, GIS/topographic base mapping, Preliminary Hydrology Study & Flood Analysis, quantities/cost estimates, and Storm Water Quality documents for the 300-acre, 20 MW U.S. Solar Borrego Springs photovoltaic (PV) facility in San Diego County, CA. JBA provided design layouts for both fixed and tracking PV layouts.
Client
U.S. Solar Holdings
Project Location
San Diego County, CA