Engineering | Surveying | GIS | Planning

Login/Logout

[dipl_ajax_search include_post_types="all" disabled_on="off|off|on" admin_label="DP Ajax mobile search" _builder_version="4.8.1" _module_preset="default" global_colors_info="{}" theme_builder_area="et_header_layout"][/dipl_ajax_search]

120-Acre, 22 MW Photovoltaic (P.V.) Solar Project

Blyte, CA

Key Project Staff

Joseph S.C. Bonadiman, P.E. – Project Engineer
Edward J. Bonadiman, P.L.S. – Survey Manager
Dennis W. Jackson, P.E. – Senior Water Resources Engineer

Project Description

JBA provided Construction Staking and prepared the ALTA Survey for the 120-acre, 22 MW First Solar, Inc. Blythe photovoltaic (PV) facility near Blythe in Riverside County, CA.

The project has since been constructed.

Client

Modern Alloys, Inc, (Staking)

Project Location
Blyte, CA