|
|
|
|
| |
JBA prepared a Hydrology & Hydraulics
Study for a proposed quarry near the Big
Rock Wash and Pearblossom Highway in
Los Angeles County, CA. The Study had
to consider several factors, including the
Big Rock Wash itself, existing levees, and
proposed California Department of
Transportation (CalTrans) improvements.
JBA performed all applicable Rational
Hydrology Method calculations using its inhouse
LAR04 (F0608) L.A. County Modified
Rational Method software application. These
calculations were subsequently used in the
design of mitigation measures, including
multiple flood control basins to be located near
the boundary lines of the project site. |
 |
| |
|
Client:
Lilburn Corporation |
| |
|
Location:
Los Angeles County, CA |
|
|
| |
|
|
|
|